This week against any other.
Was last week actually worse, or did it just feel that way? Beltr puts two periods on the same axis, per shift or per product, and does the arithmetic that a spreadsheet makes painful.
- For
- Process engineer, Production manager, Energy coordinator
- Found steam flow and production tags for PM2
- Read both weeks · read-only · 4 queries
- Left out 2 stops, computed tonnes of steam per tonne of paper
Specific steam use is 6 % higher this week: 1.42 against 1.34 t/t. Most of the difference is on the night shift, from Wednesday on. Day and evening shifts are within 2 % of last year.
| Shift | This week | Last year | Δ |
|---|---|---|---|
| Day | 1.36 | 1.34 | +1.5 % |
| Evening | 1.37 | 1.35 | +1.5 % |
| Night | 1.52 | 1.33 | +14 % |
Worked example from a fictive site with synthetic data.
Period comparison, the way it usually goes.
Comparing periods sounds simple and rarely is. The two weeks have different production volumes, a grade change in the middle and a four-hour stop that should not count.
In a spreadsheet that means exporting two data sets, removing the stop by hand and hoping the timestamps line up. Most comparisons stop at a monthly average that hides what happened.
From question to answer in four steps.
The same example as in the window above, step by step.
Name the two periods and the split
“Compare steam per tonne this week with the same week last year, by shift.” Periods can be dates, batches, campaigns or shifts.
Beltr builds the figure properly
It resamples steam flow and production to the same interval, computes the specific consumption and leaves out the periods when the line was down.
Both periods on one axis
The curves are overlaid from a common start, with a table of the difference per shift underneath.
Ask the next question
“Which shift explains most of the difference?” The answer builds on the same data, so it takes seconds.
An answer you can defend.
- An overlay chart of the two periods on a shared axis
- A table of the key figure per shift, day or product, with the difference
- A comparison you can repeat next week by changing the dates
Good to know.
Can I compare by shift when shifts are not stored in the historian?
How are stops and start-ups handled?
Does this replace our BI reports?
Root cause analysis
Find what moved first when a process drifts off spec.
02Golden batch comparison
Overlay any batch on your best one, phase by phase.
03Energy per tonne
Specific energy by charge, product, shift and season.
04Trip and downtime analysis
The sequence of events before a trip, break or stop.
05Equipment degradation
Slow drifts in efficiency, temperature and flow.