Use cases · Period comparison

This week against any other.

Was last week actually worse, or did it just feel that way? Beltr puts two periods on the same axis, per shift or per product, and does the arithmetic that a spreadsheet makes painful.

For
Process engineer, Production manager, Energy coordinator
Beltr / Nordelv Papir · PM21 source · read-only● Agent ready
Steam per tonne
Compare steam per tonne this week with the same week last year, by shift.
  • Found steam flow and production tags for PM2
  • Read both weeks · read-only · 4 queries
  • Left out 2 stops, computed tonnes of steam per tonne of paper

Specific steam use is 6 % higher this week: 1.42 against 1.34 t/t. Most of the difference is on the night shift, from Wednesday on. Day and evening shifts are within 2 % of last year.

QueriesTransformsInspect evidence
Ask a follow-up…
PM2 · steam per tonne, week 45
Same week last yearThis weekt/t
ShiftThis weekLast yearΔ
Day1.361.34+1.5 %
Evening1.371.35+1.5 %
Night1.521.33+14 %
Source: Mill historian (ODBC)Synthetic demo siteInspect evidence →

Worked example from a fictive site with synthetic data.

The situation

Period comparison, the way it usually goes.

Comparing periods sounds simple and rarely is. The two weeks have different production volumes, a grade change in the middle and a four-hour stop that should not count.

In a spreadsheet that means exporting two data sets, removing the stop by hand and hoping the timestamps line up. Most comparisons stop at a monthly average that hides what happened.

In Beltr

From question to answer in four steps.

The same example as in the window above, step by step.

01

Name the two periods and the split

“Compare steam per tonne this week with the same week last year, by shift.” Periods can be dates, batches, campaigns or shifts.

02

Beltr builds the figure properly

It resamples steam flow and production to the same interval, computes the specific consumption and leaves out the periods when the line was down.

03

Both periods on one axis

The curves are overlaid from a common start, with a table of the difference per shift underneath.

04

Ask the next question

“Which shift explains most of the difference?” The answer builds on the same data, so it takes seconds.

What you walk away with

An answer you can defend.

  • An overlay chart of the two periods on a shared axis
  • A table of the key figure per shift, day or product, with the difference
  • A comparison you can repeat next week by changing the dates
Questions about period comparison

Good to know.

Can I compare by shift when shifts are not stored in the historian?
Yes. Shift patterns are defined once in Beltr, and every analysis can then group by them.
How are stops and start-ups handled?
You can tell Beltr to leave out periods where a running signal is below a threshold, and it states that it did so in the answer.
Does this replace our BI reports?
No. Dashboards answer the questions you knew in advance. This is for the question that came up this morning.
More use cases
Talk to Beltr

No commitment.
Just a conversation about your plant.